Top floor at Llandaff library to close for redecoration

Changes at Llandaff - happening soon

Changes at Llandaff – happening soon

A section of Llandaff Library will be shut for a metamorphosis and upgrading over the summer months.   The top floor of the main book library will close from 17th June to open again in September with a new improved look and carpet. 

As the majority of our arts, architecture and design collection is housed here, we’re extending the number of Llandaff-based library loans over the summer holiday period from 15 to 30.  Llandaff-based students and staff have until 14th June to take advantage of this.  After that, all books on top floor will be boxed and stored until the work has been completed. 

Zone 1 2nd floor

Before… the top floor of Llandaff Library, due to shut for redecorating over the summer from 17th June

The library at Howard Gardens will open throughout the summer, so you can continue to access and enjoy their diverse and inspirational collection of books, DVDs and journals.  

Our Electronic Library and library catalogue will be changing as well, though you will still be able to access the full range of electronic books, journals and images over the summer.  Click here to find out more.

Caterpillar
photo credit: macropoulos via photopin cc

Advertisements

Leave a comment

Filed under General information, Resources

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s